We have taken a great leap of faith and nerve to embark on building our first home. This is our story....
Showing posts with label Air-conditioning. Show all posts
Showing posts with label Air-conditioning. Show all posts
Air Conditioning unit installed
We had the Air Con unit installed yesterday. We couldn't use it for a day so that it could settle. It works well. Can be switched to come on either upstairs or downstairs or both.
Painting finished (almost!)
The painting is pretty much finished now. Although the gable decorations have still been left paperbark colour rather than Oil skin as per the contract. We had highlighted this already to Allcastle even before the scafolding was taken away. As long as it's put right before the final inspection, no problem.

The downpipes and Meter box have been painted Jasper

Also noticed this downpipe has not been put on straight. We shall have to pull this up on the inspection.

All the painting has been finished inside. The vents for the Air conditioning have also been installed.



The downpipes and Meter box have been painted Jasper
Also noticed this downpipe has not been put on straight. We shall have to pull this up on the inspection.
All the painting has been finished inside. The vents for the Air conditioning have also been installed.
Labels:
Air-conditioning,
Painting,
Rain water downpipes
Electrical rough in
The Electrical rough in was done on Friday. This is where the Electrician runs all the cables required for power sockets, lighting and TV point. This has to be done before the walls are gyprocked, whilst there is still access.


The picture below shows where all the wires go to on the outside garage wall.

This is the meter box on the outside of the garage wall.

This picture shows where the kitchen floor has been chased out for the cables running to the island bench.

We also noticed that the ducting had been installed for the air-conditioning.
The picture below shows where all the wires go to on the outside garage wall.
This is the meter box on the outside of the garage wall.
This picture shows where the kitchen floor has been chased out for the cables running to the island bench.
We also noticed that the ducting had been installed for the air-conditioning.