Painting finished (almost!)

The painting is pretty much finished now. Although the gable decorations have still been left paperbark colour rather than Oil skin as per the contract. We had highlighted this already to Allcastle even before the scafolding was taken away. As long as it's put right before the final inspection, no problem.



The downpipes and Meter box have been painted Jasper



Also noticed this downpipe has not been put on straight. We shall have to pull this up on the inspection.



All the painting has been finished inside. The vents for the Air conditioning have also been installed.







Rain water downpipes

The rainwater downpipes have now been installed.