The pipework for the plumbing has been roughed in. All the water supply is done in black plastic hose instead of copper pipe these days. It looks a lot easier to install and they certainly put it in quick. Just hope we don't accidently drill into any of it in the future as it probably wouldn't take much to burst it. We might have to take plenty of pictures to show where it's all located, before the Gyprock is put up.
The picture below shows the en-suite bathroom. You can see the pipework for the bath which will be under the window.
This picture shows the drainage pipework coming down from the en-suite bathroom.
No comments:
Post a Comment