Painting finished (almost!)

The painting is pretty much finished now. Although the gable decorations have still been left paperbark colour rather than Oil skin as per the contract. We had highlighted this already to Allcastle even before the scafolding was taken away. As long as it's put right before the final inspection, no problem.



The downpipes and Meter box have been painted Jasper



Also noticed this downpipe has not been put on straight. We shall have to pull this up on the inspection.



All the painting has been finished inside. The vents for the Air conditioning have also been installed.







Painting started

We had a look inside the house today and saw that the painting had started.









Tiling - Part 1

We had a look on site today and saw that the floors in the bathrooms and laundry had been tiled.

Here is the Main Bathroom



Ensuite



Downstairs Bathroom



Laundry



Also, the kitchen walls had been tiled but a mistake has been made. We're not sure if the tiler was aware but there will be a stainless steel splashback above the cooker. Which means the tiles should not have been put on the part of the wall above where the cooker will go.



Oh well, as long as it's put right, no problem.

Baths installed

The baths have now been installed.





They have also now been bricked around ready to be tiled.
This is the bath in the main bathroom.



This is the spa bath in the ensuite.

Garage door

We drove past house today and noticed that the Garage door had been put on. We were glad to see this as we had been wondering how well the colour would go with the rest of the house. We're very pleased with it.



It's actually a metal door but with a wood effect finish. This was an upgrade to have one double door rather than two single doors. It should make parking and reversing out of the garage easier. We're just hoping that the stain for the front door will match with it.

Rain water downpipes

The rainwater downpipes have now been installed.

Kitchen and Vanity Units

We have a kitchen. Drove past on Thursday and saw a Ute in the drive and the back was all covered. We guessed it must be the Kitchen. No one was around that afternoon so couldn't have a look till today. Site Supervisor was on site so we asked if the kitchen had been delivered he said it was in and we could have a look. Here it is.



View from the dining area.



Also the bathroom vanity units have been installed.

Below is the downstairs vanity unit.



Main bathroom vanity.



Ensuite vanity.